<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Trotoar Jalan R Suprapto Arsip - Bontang Post</title>
	<atom:link href="https://bontangpost.id/tag/trotoar-jalan-r-suprapto/feed/" rel="self" type="application/rss+xml" />
	<link>https://bontangpost.id/tag/trotoar-jalan-r-suprapto/</link>
	<description>Mencerdaskan dan Menginspirasi</description>
	<lastBuildDate>Mon, 13 Jan 2025 02:22:02 +0000</lastBuildDate>
	<language>id</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.4</generator>

<image>
	<url>https://bontangpost.id/wp-content/uploads/2018/04/bp-cropped-favicon-bpost1-2-32x32.png</url>
	<title>Trotoar Jalan R Suprapto Arsip - Bontang Post</title>
	<link>https://bontangpost.id/tag/trotoar-jalan-r-suprapto/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Perbaikan Trotoar Jalan R Suprapto Dikucur Rp25 Miliar</title>
		<link>https://bontangpost.id/perbaikan-trotoar-jalan-r-suprapto-dikucur-rp25-miliar/</link>
		
		<dc:creator><![CDATA[Redaksi Bontang Post]]></dc:creator>
		<pubDate>Mon, 13 Jan 2025 02:22:02 +0000</pubDate>
				<category><![CDATA[Bontang]]></category>
		<category><![CDATA[Trotoar Jalan R Suprapto]]></category>
		<guid isPermaLink="false">https://bontangpost.id/?p=134843</guid>

					<description><![CDATA[<p>BONTANGPOST.ID, Bontang &#8211; Pemkot Bontang mendapatkan kucuran bantuan keuangan (bankeu) dari Pemprov Kaltim Rp220 miliar. Berdasarkan nominal tersebut terdapat salah satu pos untuk revitalisasi trotoar Jalan R Suprapto. Kabid Bina Marga Dinas Pekerjaan Umum dan Penataan Ruang Kota (PUPRK) Anwar Nurdin mengatakan nilai dari rencana pembangunan itu yakni Rp25 miliar. “Ini merupakan lanjutan pembangunan. Karena satu sisi sudah digarap beberapa tahun [&#8230;]</p>
<p>Artikel <a href="https://bontangpost.id/perbaikan-trotoar-jalan-r-suprapto-dikucur-rp25-miliar/">Perbaikan Trotoar Jalan R Suprapto Dikucur Rp25 Miliar</a> pertama kali tampil pada <a href="https://bontangpost.id">Bontang Post </a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>BONTANGPOST.ID, Bontang &#8211; </strong>Pemkot Bontang mendapatkan kucuran bantuan keuangan (bankeu) dari Pemprov Kaltim Rp220 miliar. Berdasarkan nominal tersebut terdapat salah satu pos untuk revitalisasi trotoar Jalan R Suprapto.</p>
<p>Kabid Bina Marga Dinas Pekerjaan Umum dan Penataan Ruang Kota (PUPRK) Anwar Nurdin mengatakan nilai dari rencana pembangunan itu yakni Rp25 miliar. “Ini merupakan lanjutan pembangunan. Karena satu sisi sudah digarap beberapa tahun lalu,” kata Nurdin.</p>
<p>Nantinya pengerjaan menyasar depan RS Amalia. Lebar parit akan menjadi satu meter. Target pengerjaan panjang dua kilometer. Dari simpang empat Bontang Baru hingga depan Kantor Utama BRI Bontang. Khusus untuk sisi seberang juga akan diteruskan dari BPD Kaltimtara hingga mencukupi volume yang ada.</p>
<p>“Nantinya kami harapkan aliran air semakin lancar setelah perbaikan parit dan trotoar,” ucapnya.</p>
<p>Menurutnya pengerjaan itu seharusnya dilakukan di tahun lalu. Tetapi Dinas PUPRK mengalihkannya ke Jalan Suryanata. Pasalnya jika dipaksakan dengan volume parit di Jalan Suryanata sebelumnya tidak mampu menampung debit air buangan.</p>
<p>“Itu sudah kami pikirkan kala itu. Sebab itu kami alihkan untuk rencana perbaikan di Jalan R Soeparpto ke Suryanata,” tutur dia.</p>
<p>Nominal ini merupakan paling besar dari pengerjaan drainase sebelumnya. Diketahui untuk pembangunan trotoar di Jalan Ahmad Yani pada 2023 mendapat gelontoran Rp17 miliar. Kemudian seberangnya yang tahun lalu senilai Rp11 miliar. Bergeser ke Jalan Suryanata mendapat kucuran Rp7 miliar.</p>
<p>“Penanganannya ini lebih panjang. Khusus trotoar ada beberapa titik yang lebar. Karena memanfaatkan bahu jalan,” pungkasnya. <strong>(*)</strong></p>
<p>Artikel <a href="https://bontangpost.id/perbaikan-trotoar-jalan-r-suprapto-dikucur-rp25-miliar/">Perbaikan Trotoar Jalan R Suprapto Dikucur Rp25 Miliar</a> pertama kali tampil pada <a href="https://bontangpost.id">Bontang Post </a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Pengerjaan Trotoar Suprapto Dinilai Lamban, Kontraktor Dipanggil (Lagi)</title>
		<link>https://bontangpost.id/pengerjaan-trotoar-suprapto-dinilai-lamban-kontraktor-dipanggil-lagi/</link>
		
		<dc:creator><![CDATA[Redaksi Bontang Post]]></dc:creator>
		<pubDate>Mon, 28 Nov 2022 06:37:06 +0000</pubDate>
				<category><![CDATA[Bontang]]></category>
		<category><![CDATA[Trotoar Jalan R Suprapto]]></category>
		<guid isPermaLink="false">https://bontangpost.id/?p=107527</guid>

					<description><![CDATA[<p>bontangpost.id &#8211; Komisi III DRPD memberi peringatan keras kepada kontraktor pengerjaan trotoar di Jalan R Suprapto. Bahkan jika sampai tanggal 10 Desember progresnya tidak signifikan akan memanggil kontraktor. Ketua Komisi III Amir Tosina mengaku khawatir dengan pengerjaan ini. Sebab kontrak batasnya hingga 15 Desember. “Waktunya sudah dekat. Tetapi progresnya memprihatinkan,” kata Amir. Selain itu, pihaknya [&#8230;]</p>
<p>Artikel <a href="https://bontangpost.id/pengerjaan-trotoar-suprapto-dinilai-lamban-kontraktor-dipanggil-lagi/">Pengerjaan Trotoar Suprapto Dinilai Lamban, Kontraktor Dipanggil (Lagi)</a> pertama kali tampil pada <a href="https://bontangpost.id">Bontang Post </a>.</p>
]]></description>
										<content:encoded><![CDATA[<p class="s3"><span class="s2"><span class="bumpedFont15"><strong>bontangpost.id &#8211;</strong> Komisi </span></span><span class="s2"><span class="bumpedFont15">III DRPD memberi peringata</span></span><span class="s2"><span class="bumpedFont15">n keras kepada </span></span><span class="s2"><span class="bumpedFont15">kontraktor pengerjaan trotoar di Jalan R Suprap</span></span><span class="s2"><span class="bumpedFont15">to. Ba</span></span><span class="s2"><span class="bumpedFont15">hkan </span></span><span class="s2"><span class="bumpedFont15">jika sampai tanggal 10 Desember progresnya tidak sig</span></span><span class="s2"><span class="bumpedFont15">nifikan akan memanggil kontraktor. Ketua Komisi III Amir Tosina mengaku khawatir</span></span><span class="s2"><span class="bumpedFont15"> dengan pengerjaan ini. Sebab kontrak batasnya hingga 15 Desember. </span></span></p>
<p class="s3"><span class="s2"><span class="bumpedFont15">“</span></span><span class="s2"><span class="bumpedFont15">Waktunya s</span></span><span class="s2"><span class="bumpedFont15">udah dekat</span></span><span class="s2"><span class="bumpedFont15">. Tetapi progresnya memprihatinkan,</span></span><span class="s2"><span class="bumpedFont15">”</span></span><span class="s2"><span class="bumpedFont15"> kata Amir. </span></span></p>
<p class="s3"><span class="s2"><span class="bumpedFont15">Selain itu, p</span></span><span class="s2"><span class="bumpedFont15">ihaknya juga</span></span><span class="s2"><span class="bumpedFont15"> memerintahkan kepada Dinas Pekerjaan Umum dan Penataa</span></span><span class="s2"><span class="bumpedFont15">n Ruang Kota </span></span><span class="s2"><span class="bumpedFont15">(PUPRK) untuk</span></span><span class="s2"><span class="bumpedFont15"> me</span></span><span class="s2"><span class="bumpedFont15">mperhatikan waktu </span></span><span class="s4"><span class="bumpedFont15">deadline </span></span><span class="s2"><span class="bumpedFont15">pengerjaan. Terlepas nantinya apakah diberi perpanjangan waktu p</span></span><span class="s2"><span class="bumpedFont15">engerjaan. </span></span></p>
<p class="s3"><span class="s2"><span class="bumpedFont15">“</span></span><span class="s2"><span class="bumpedFont15">Saya tekankan risiko harus ditanggung kontraktor. Salah satunya berupa </span></span><span class="s4"><span class="bumpedFont15">bla</span></span><span class="s4"><span class="bumpedFont15">cklist</span></span><span class="s2"><span class="bumpedFont15"> perusahaan tersebut kalau tidak rampung tepat waktu,</span></span><span class="s2"><span class="bumpedFont15">”</span></span><span class="s2"><span class="bumpedFont15"> ucapnya</span></span><span class="s2"><span class="bumpedFont15">. </span></span></p>
<p class="s3"><span class="s2"><span class="bumpedFont15">Kejadian ini </span></span><span class="s2"><span class="bumpedFont15">perlu menjadi pembelajaran. Bahwa proses lelang dibuka jangan mepet waktu dengan batas waktu anggaran. Pasalnya setiap ada proyek besar selalu </span></span><span class="s2"><span class="bumpedFont15">melewati tenggat waktu</span></span><span class="s2"><span class="bumpedFont15">. Kondisi ini bukan sekali terja</span></span><span class="s2"><span class="bumpedFont15">di tiap tahunnya. </span></span></p>
<p class="s3"><span class="s2"><span class="bumpedFont15">“</span></span><span class="s2"><span class="bumpedFont15">Ini jad</span></span><span class="s2"><span class="bumpedFont15">i pengalaman. Jangan dibuka lelang padahal waktunya mepet,</span></span><span class="s2"><span class="bumpedFont15">”</span></span> <span class="s2"><span class="bumpedFont15">tutur Politik</span></span><span class="s2"><span class="bumpedFont15">us Partai Gerindra ini. </span></span></p>
<p class="s3"><span class="s2"><span class="bumpedFont15">Pihaknya juga akan melakukan pengawasan</span></span><span class="s2"><span class="bumpedFont15">. </span></span><span class="s2"><span class="bumpedFont15">Sehubungan dengan skema kontraktor menerapkan sistem lembur</span></span><span class="s2"><span class="bumpedFont15">. Tujuannya untuk mempercepat pengerjaan. </span></span><span class="s2"><span class="bumpedFont15">Ia pun t</span></span><span class="s2"><span class="bumpedFont15">idak memperca</span></span><span class="s2"><span class="bumpedFont15">yai </span></span><span class="s2"><span class="bumpedFont15">se</span></span><span class="s2"><span class="bumpedFont15">ratus persen terkait penyampaian </span></span><span class="s2"><span class="bumpedFont15">progres</span></span> <span class="s2"><span class="bumpedFont15">p</span></span><span class="s2"><span class="bumpedFont15">engerjaan </span></span><span class="s2"><span class="bumpedFont15">saat legi</span></span><span class="s2"><span class="bumpedFont15">slator </span></span><span class="s2"><span class="bumpedFont15">melakukan kunjungan lapangan awal pekan lalu.</span></span></p>
<p class="s3"><span class="s2"><span class="bumpedFont15">“</span></span><span class="s2"><span class="bumpedFont15">Kam</span></span><span class="s2"><span class="bumpedFont15">i akan pantau benar tidak ada lembur</span></span><span class="s2"><span class="bumpedFont15">. Soal </span></span><span class="s2"><span class="bumpedFont15">progress</span></span> <span class="s2"><span class="bumpedFont15">itu belum ten</span></span><span class="s2"><span class="bumpedFont15">tu seperti yang diucapkan mereka</span></span><span class="s2"><span class="bumpedFont15">,</span></span><span class="s2"><span class="bumpedFont15">”</span></span><span class="s2"><span class="bumpedFont15"> sebutnya. </span></span></p>
<p class="s3"><span class="s2"><span class="bumpedFont15">P</span></span><span class="s2"><span class="bumpedFont15">ada awal pekan ini progr</span></span><span class="s2"><span class="bumpedFont15">esnya masih di angka 64 persen. </span></span><span class="s2"><span class="bumpedFont15">D</span></span><span class="s2"><span class="bumpedFont15">ari </span></span><span class="s2"><span class="bumpedFont15">total pengerjaan panjang trotoar yakni 800 m</span></span><span class="s2"><span class="bumpedFont15">eter masih tercapai 630 meter. </span></span><span class="s2"><span class="bumpedFont15">Mengenai itu, Dinas </span></span><span class="s2"><span class="bumpedFont15">PUPRK</span></span><span class="s2"><span class="bumpedFont15"> telah memanggil kontrakt</span></span><span class="s2"><span class="bumpedFont15">or</span></span><span class="s2"><span class="bumpedFont15">, pekan lalu. Pert</span></span><span class="s2"><span class="bumpedFont15">emuan ini dituangkan dalam berita acara. Dihadiri oleh pihak inspektorat dan dari </span></span><span class="s2"><span class="bumpedFont15">kejaksaan. Kabid Bina Marga Dinas PUPRK Anwar Nurdin mengatakan pemanggilan ini untuk mengetahui cara kontraktor menyelesa</span></span><span class="s2"><span class="bumpedFont15">i</span></span><span class="s2"><span class="bumpedFont15">ka</span></span><span class="s2"><span class="bumpedFont15">n pengerjaan di sis</span></span><span class="s2"><span class="bumpedFont15">a waktu yang ada.</span></span></p>
<p class="s3"><span class="s2"><span class="bumpedFont15">“Nantinya ak</span></span><span class="s2"><span class="bumpedFont15">an dituangkan </span></span><span class="s2"><span class="bumpedFont15">secara tertulis dan diserahkan kepada kami (Dinas PUPRK),</span></span><span class="s2"><span class="bumpedFont15">” kata Anwar. </span></span></p>
<p class="s3"><span class="s2"><span class="bumpedFont15">Selain itu D</span></span><span class="s2"><span class="bumpedFont15">inas PUPRK sudah menyampaikan usulan agar kontraktor menambah jam kerja </span></span><span class="s2"><span class="bumpedFont15">dan jumlah te</span></span><span class="s2"><span class="bumpedFont15">naganya. </span></span><span class="s2"><span class="bumpedFont15">P</span></span><span class="s2"><span class="bumpedFont15">asalny</span></span><span class="s2"><span class="bumpedFont15">a </span></span><span class="s2"><span class="bumpedFont15">p</span></span><span class="s2"><span class="bumpedFont15">engerjaan finishing pro</span></span><span class="s2"><span class="bumpedFont15">yek </span></span><span class="s2"><span class="bumpedFont15">secara </span></span><span class="s2"><span class="bumpedFont15">progres</span></span><span class="s2"><span class="bumpedFont15"> angkanya kec</span></span><span class="s2"><span class="bumpedFont15">il. </span></span><span class="s2"><span class="bumpedFont15">T</span></span><span class="s2"><span class="bumpedFont15">etapi </span></span><span class="s2"><span class="bumpedFont15">be</span></span><span class="s2"><span class="bumpedFont15">ntuk pen</span></span><span class="s2"><span class="bumpedFont15">gerjaannya banyak. Mulai dari pengecoran </span></span><span class="s2"><span class="bumpedFont15">atas trotoar, pemasangan keramik disabilitas</span></span><span class="s2"><span class="bumpedFont15">, </span></span><span class="s2"><span class="bumpedFont15">batu sikat, </span></span><span class="s2"><span class="bumpedFont15">tiang disabilitas</span></span><span class="s2"><span class="bumpedFont15">, hingga bola beton. </span></span></p>
<p class="s3"><span class="s2"><span class="bumpedFont15">“Mengenai </span></span><span class="s2"><span class="bumpedFont15">durasi </span></span><span class="s2"><span class="bumpedFont15">lembur tidak ada ketentuan. </span></span><span class="s2"><span class="bumpedFont15">H</span></span><span class="s2"><span class="bumpedFont15">arapannya </span></span><span class="s2"><span class="bumpedFont15">melihat kondisi di lapangan. Kalau memung</span></span><span class="s2"><span class="bumpedFont15">kinkan hingga </span></span><span class="s2"><span class="bumpedFont15">24.00 Wita silakan. Atau bisa juga tem</span></span><span class="s2"><span class="bumpedFont15">bus pagi kalau tidak ada keberatan dari warga sekitar,</span></span><span class="s2"><span class="bumpedFont15">” ucapnya</span></span><span class="s2"><span class="bumpedFont15">.</span></span></p>
<p class="s3"><span class="s2"><span class="bumpedFont15">Mengenai batasan penyerahan cara penyelesaian </span></span><span class="s2"><span class="bumpedFont15">tidak ada ketentuan. Namun ia berharap itu segera di</span></span><span class="s2"><span class="bumpedFont15">sodorkan. </span></span><span class="s2"><span class="bumpedFont15">B</span></span><span class="s2"><span class="bumpedFont15">ah</span></span><span class="s2"><span class="bumpedFont15">kan usulan </span></span><span class="s2"><span class="bumpedFont15">lembur itu sudah </span></span><span class="s2"><span class="bumpedFont15">dilakukan kontraktor mulai k</span></span><span class="s2"><span class="bumpedFont15">emarin.</span></span> <span class="s5"><span class="bumpedFont15">Sebagai informasi, proyek rekonstruksi trotoar dan saluran drainase dikerjakan oleh CV Maraja Putra Mandiri dengan pagu anggara</span></span><span class="s5"><span class="bumpedFont15">n Rp 4 miliar</span></span><span class="s5"><span class="bumpedFont15">.</span></span> <span class="s5"><span class="bumpedFont15">Pada beberapa waktu lalu j</span></span><span class="s5"><span class="bumpedFont15">umlah pekerja yang menggarap proyek </span></span><span class="s5"><span class="bumpedFont15">ini</span></span><span class="s5"><span class="bumpedFont15"> terbagi dalam empat grup. Tiga gr</span></span><span class="s5"><span class="bumpedFont15">up borongan dan satu grup sistem harian. Masing–masing terdiri dari 15 orang</span></span><span class="s5"><span class="bumpedFont15">.</span></span><strong><span class="s2"><span class="bumpedFont15"> (ak)</span></span></strong><span class="s2"><span class="bumpedFont15"><br />
</span></span></p>
<p class="s3">
<p>Artikel <a href="https://bontangpost.id/pengerjaan-trotoar-suprapto-dinilai-lamban-kontraktor-dipanggil-lagi/">Pengerjaan Trotoar Suprapto Dinilai Lamban, Kontraktor Dipanggil (Lagi)</a> pertama kali tampil pada <a href="https://bontangpost.id">Bontang Post </a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
